UAF Combined Heat and Power Plant

Projects - Education

UAF Combined Heat and Power Plant

Start Date: 7/2015
Completion Date: 2/2019
Client: Unversity of Alaska Fairbanks
Location: Fairbanks, Alaska

                  The UAF CPHR Project was performed by Haskell Corporation Davis Constructors Joint Venture (HDJV). Located in Climate Zone 8, the $245 million industrial facility provides a coal-fired boiler with a total capacity of up to 240,000 lbs/hr of steam and a steam turbine with controlled extraction» Read More

UAF Engineering Facility

Start Date: 8/2012
Completion Date: 12/2017
Client: University of Alaska Fairbanks
Location: Fairbanks, Alaska

During 2013, the university and Davis Constructors and Engineers, Inc. (DCE) broke ground on a $121 million state-of-the-art engineering facility designed by ECI/Hyer Architecture and Interiors of Anchorage. The gleaming six-story, 119,000-square-foot structure was designed to have a commanding view of the Tanana Valley and the Alaska Range to the south. Nested between the Duckering» Read More

Turnagain Elementary School Renewal

Start Date: November 16, 2015
Client: Anchorage School District
Location: Anchorage, AK

The Anchorage School District designed and constructed a project to renew Turnagain Elementary School. It is currently a 54,940 SF school serving around 435 students. The existing building will be improved to serve for at least the next 20 years. The proposed plan is to increase the building size by approximately 1,240 SF. The site» Read More

UAA Wells Fargo Sports Complex Renewal

Start Date: March 3, 2015
Completion Date: October 6, 2016
Client: University of Alaska Anchorage
Location: Anchorage, AK

As one might expect when remodeling a structure from the 1970s, some spaces posed rather complex design challenges. Kristin Reynolds, the lead UAA Project Manager on the job, was proud of how the design team and contractors worked around these difficulties. “It’s much more complex in the construction phase to do a remodel like this» Read More

MSB Athletic Fields

Start Date: 05/20/2013
Completion Date: 08/01/2013
Client: Matanuska Susitna Borough
Location: Wasilla, Colony, Palmer, and Houston High Schools

Palmer: site drainage improvements, bleachers, site lighting, other improvements to complex buildings. Colony: site drainage improvements, bleachers, site lighting, running track, other improvements. Wasilla: new artificial turf, running track, bleachers, security, other improvements. Houston: new artificial turf, running track, bleachers, security, other improvements. Work began in May and we were substantially complete in early August» Read More

Sand Lake Elementary Renewal

Start Date: 04/2009
Completion Date: 08/12/2013
Client: Anchorage School District
Location: Anchorage, AK

This construction-manager-at-risk project renewed an old school by demolishing about 2/3 of the existing school, and renovating the remaining seven classrooms, toilet facilities and the gymnasium. It is a 26-classroom school with a multi-purpose room connected to the gym. The new classroom wing is on two levels, and the administration, music, and art room are» Read More

UAF Life Sciences Facility

Start Date: 04/01/2011
Completion Date: 07/01/2013
Client: University of Alaska Fairbanks
Location: Fairbanks, AK

  The UAF Life Science Research and Teaching Facility combines 40,000sq ft of academic and 57,000 sq ft of biological research space with versatile state-of the-art laboratories to support research and teaching in cell and molecular biology, physiology, infectious diseases and neurobiology. It also includes a 150-seat auditorium; and a centralized instructional and administrative home» Read More

Service High Artificial Turf

Start Date: 04/01/2012
Completion Date: 08/01/2012
Client: Anchorage School District
Location: Anchorage, AK

The replacement of the Service High School natural grass field with synthetic turf provides a high quality, safe, low maintenance field that will expand the opportunity for extended use throughout the year by students, staff and the community. The scope of work for this project included construction of the artificial turf playing surface, complete with» Read More

Clark Middle School Renewal

Start Date: 10/01/2006
Completion Date: 07/01/2009
Client: Anchorage School District
Location: Anchorage, AK

Clark Middle School was a complete replacement of the existing facility; the students were relocated for the duration of the development. The 176,000 sq ft replacement school consists of three stories of educational wings and two stories of administration/multipurpose wings. The building was built to the latest educational specifications and included an indoor track above» Read More

ANSEP – Alaska Native Science & Engineering Program Facility

Start Date: 09/01/2005
Completion Date: 08/01/2006
Client: University of Alaska
Location: Anchorage, AK

The Alaska Native Science and Engineering Program Facility is a 14,000 sq ft, two-story learning center. The north half of the building is a two story atrium area which serves as a multipurpose use area for project displays, large class assembly, and study area. It is equipped with a kitchen and serves as a community» Read More