Davis contracted with the Anchorage School District to perform as a General Contractor/ Construction Manager for the design and construction of the Eagle River Area High School (ERAHS). This contract was for constructing the first phase of ERAHS to serve 800 students.
The undeveloped 50 acre site is located on Yosemite Road near the intersection of Hiland and Eagle River Loop Road . ERAHS is a two-story, 180,000 sq ft building with site development for parking, sports, and other school amenities. The school was substantially complete on July 15, 2005, and opened for the 2005-2006 school year.