The Dome Reconstruction

Projects - Slideshow

The Dome Reconstruction

Start Date: August 8, 2017
Completion Date: January 3, 2018

At 180,000 square feet, The Dome is the largest sports complex of its kind. It is held down with pipes and cables plunging 40 feet into the ground, and is supported by pressurized air. Snow and wind sensors automatically increase or decrease pressure and temperature of The Dome, keeping it at 15 to 17 lbs» Read More

UAF Combined Heat and Power Plant

Start Date: 7/2015
Completion Date: 2/2019
Client: Unversity of Alaska Fairbanks
Location: Fairbanks, Alaska

                  The UAF CPHR Project was performed by Haskell Corporation Davis Constructors Joint Venture (HDJV). Located in Climate Zone 8, the $245 million industrial facility provides a coal-fired boiler with a total capacity of up to 240,000 lbs/hr of steam and a steam turbine with controlled extraction» Read More

EIE 405 Utiliduct

Start Date: 2/2018
Completion Date: 2/2019
Client: U.S.A.C.E
Location: Eielson AFB, AK

EIE405 is being performed by the Haskell Corporation Davis Constructors  Joint Venture. Located in Climate Zone 8, the $46 million addition to Eielson’s existing Utilidor system allows for base expansion to accommodate two new F-35 squadrons. The EIE405 project involves constructing steam and water piping in a underground utility line duct enclosure (utiliduct) starting at» Read More

UAF Engineering Facility

Start Date: 8/2012
Completion Date: 12/2017
Client: University of Alaska Fairbanks
Location: Fairbanks, Alaska

During 2013, the university and Davis Constructors and Engineers, Inc. (DCE) broke ground on a $121 million state-of-the-art engineering facility designed by ECI/Hyer Architecture and Interiors of Anchorage. The gleaming six-story, 119,000-square-foot structure was designed to have a commanding view of the Tanana Valley and the Alaska Range to the south. Nested between the Duckering» Read More

Anchorage Museum Expansion

Start Date: 02/01/2016
Completion Date: 05/01/2017
Client: Anchorage Museum Association
Location: 625 C Street

During the Anchorage Museum Expansion pre-construction services, Davis was tasked with reviewing 4 sets of construction drawings. The original 1967 drawings, remodels in 1975 and 1985, and an additional expansion in 2005 were part of the evaluation. We had to make sure that our concrete demolition and threading of new steel columns through the existing» Read More

New Anchorage Meeting Venue Available- great for Weddings and Reunions!

Anchorage’s NEWEST Training Facility/Conference Center- 6591 A Street, Anchorage, AK 99518 The Davis Campus features “The Megan Room”. Our 1,722 square foot training space/conference center is able to accommodate up to 72 seated classroom style, or 115 seated theater style or up to 115 for a standing reception. Included with your rental are coffee/tea/water service, access to the» Read More

JBER Military Housing Privatization

Start Date: 11/29/2010
Completion Date: 05/04/2011
Client: Aurora Military Housing III
Location: JBER, AK

Regal 16 IMAX Cinema Tikahtnu

Start Date: 06/01/2009
Completion Date: 05/01/2010
Client: Browman Development
Location: Anchorage, AK

Regal IMAX Theater at Tikhatnu Commons in Anchorage, AK

Target at Tikahtnu Commons

Start Date: 10/03/2007
Completion Date: 08/25/2008
Client: Target
Location: Anchorage, AK

Providence Alaska Medical Center Creekside Campus Phase II – MOB2 and Providence House

Start Date: 09/02/2005
Completion Date: 11/20/2007
Client: Providence Alaska Medical Center
Location: Anchorage, AK

This is the second 110,000 sq ft, 5-story class A medical office building of the Providence Southwest Expansion program. The Medical Office Building 2 (MOB2) houses the Cancer Center on the lower level, 1st and 2nd floor. This project also includes a 133,000 sq ft, 365 stall addition to the parking garage, a Sky bridge» Read More