The Dome Reconstruction

Projects - Other

The Dome Reconstruction

Start Date: August 8, 2017
Completion Date: January 3, 2018

At 180,000 square feet, The Dome is the largest sports complex of its kind. It is held down with pipes and cables plunging 40 feet into the ground, and is supported by pressurized air. Snow and wind sensors automatically increase or decrease pressure and temperature of The Dome, keeping it at 15 to 17 lbs» Read More

LRDR Foundation

Start Date: 3/2018
Completion Date: 8/2019
Client: STG Pacific

The LRDR Foundation consisted of a massive footing designed to resist seismic forces, blast and differential settlement.  The STG Pacific (STGP) team continuously placed 4,000 CY of concrete in a mass pour lasting 20+ hours for the pile cap. The LES Foundation is key infrastructure for MDA to provide national defensive capabilities against ballistic missiles» Read More

LRDR Launch Equipment Shelter

Start Date: 6/2018
Completion Date: 4/2020
Client: Lockheed Martin

The LRDR Equipment Shelter is being constructed by Haskell Corporation Davis Constructors Joint Venture (HDJV). The Long Range Discrimination Radar (LRDR) program is the backbone of the Missile Defense Agency’s layered defense strategy to protect the U.S. homeland from ballistic missile attack. LRDR is a long range radar that will provide precision metric data to» Read More

UAF Combined Heat and Power Plant

Start Date: 7/2015
Completion Date: 2/2019
Client: Unversity of Alaska Fairbanks
Location: Fairbanks, Alaska

                  The UAF CPHR Project was performed by Haskell Corporation Davis Constructors Joint Venture (HDJV). Located in Climate Zone 8, the $245 million industrial facility provides a coal-fired boiler with a total capacity of up to 240,000 lbs/hr of steam and a steam turbine with controlled extraction» Read More

EIE 405 Utiliduct

Start Date: 2/2018
Completion Date: 2/2019
Client: U.S.A.C.E
Location: Eielson AFB, AK

EIE405 is being performed by the Haskell Corporation Davis Constructors  Joint Venture. Located in Climate Zone 8, the $46 million addition to Eielson’s existing Utilidor system allows for base expansion to accommodate two new F-35 squadrons. The EIE405 project involves constructing steam and water piping in a underground utility line duct enclosure (utiliduct) starting at» Read More

AAC PSCA – Kodiak Launch Facility

Start Date: September 3, 2015
Completion Date: July 13, 2016
Client: Alaska Aerospace Corporation
Location: Kodiak, AK

In 2014, seconds after a rocket carrying a test weapon was launched from the Kodiak Launch Complex, the rocket suffered an anomaly and was destructed, causing large amounts of damage on the complex grounds.  Davis was selected in 2015 for the rebuild. There were many risks- no potable water, no construction elevator, no crane on» Read More

Eagle Crossing Subdivision

Start Date: 08/15/2012
Completion Date: 11/06/2012
Client: Driftwood Bay LLC
Location: Eagler River, AK

Powder Ridge Subdivision

Start Date: 05/30/2012
Completion Date: 10/01/2012
Client: Eklutna Inc.
Location: Eagle River, AK

Service High Artificial Turf

Start Date: 04/01/2012
Completion Date: 08/01/2012
Client: Anchorage School District
Location: Anchorage, AK

The replacement of the Service High School natural grass field with synthetic turf provides a high quality, safe, low maintenance field that will expand the opportunity for extended use throughout the year by students, staff and the community. The scope of work for this project included construction of the artificial turf playing surface, complete with» Read More

Eklutna Plaza Fill

Start Date: 04/12/2012
Completion Date: 08/01/2012
Client: Eklutna Inc.
Location: Eagle River, AK