Currently in preconstruction, this
construction-manager-at-risk project will renew an old school
by demolishing about 2/3 of the existing school, and renovating
the remaining seven classrooms, toilet facilities and the
gymnasium. When completed it will be a 26-classroom school.
The Multi-purpose room will be connected to the Gym. The new
classroom wing will be on two levels, and the Administration,
IMC, Music and Art room to be on single level.
The exterior will
have metal sidings, stucco/EIFS on metal studs with batt insulation
and translucent panels are planned for tactile texture and
color. Main entry will have covered canopies. The roofing
will be EPDM Single ply membrane over rigid insulation. This
being a Japanese immersion school, it will have translucent
light panels (Kal-wall) reminiscent of the Shoji Screen that
are often used within the Japanese culture.