This project is using a Construction
Manager at Risk (CM@Risk) project delivery system and will
consist of three major components:
- 80,000 sf expansion to the
south of existing terminal – which will include reconfiguration
of roadways, parking, and airside terminal area.
- 65,000 sf renovation of existing
terminal built in 1985 – the existing terminal building
will be completely gutted and renovated and reconfigured
including mechanical and electrical, the exterior wall system
will be renovated, and the foundation and structure will
receive seismic upgrades.
- Demolition of pre-1985 terminal
– the north end of the terminal will be demolished, and
replaced with an aircraft area.
Because
of the complexity of project. and the need to keep the airport
fully operational during construction, it will be broken out
into several phases including sitework and demolition, foundation,
structural steel, addition and renovation.
 |
 |
 |
 |
 |
 |
| February 26 2008 |
February 26 2008 |
February 28 2008 |
March 4 2008 |
March 4 2008 |
 |
 |
 |
 |
 |
| February 25 2008 |
March 4 2008 |
February 29 2008 |
March 4 2008 |
March 4 2008 |
|