Davis Constructors & Engineers, Inc.

Projects - Public Facilities

Alaska Gallery Renovation

Start Date: September 6, 2016
Completion Date: March 31, 2017
Client: Anchorage Museum Association
Location: Anchorage, AK

The Alaska Gallery Renovation consists of construction of the new gallery space to include the installation, coordination, and modification of existing finishes, mechanical, electrical, security, life safety, HVAC systems, etc. of approximately 13,000 SF of gallery space located on the South East 2nd floor level of the existing Museum with minimal disruption to the functioning» Read More

Anchorage Museum Expansion

Start Date: 02/01/2016
Completion Date: 05/01/2017
Client: Anchorage Museum Association
Location: 625 C Street

The Anchorage Museum is constructing permanent galleries for the Art of the North exhibition. An approximately 25,000 sq ft wing is being constructed over the existing first floor and basement at the North side of the Museum. Additional areas will be constructed at street level and the north and east sides of the Museum.  » Read More

King’s Landing at Ship Creek

Start Date: June 15, 2015
Completion Date: July 15, 2016
Client: Municipality of Anchorage
Location: Anchorage, AK

The King’s Landing at Ship Creek Phase II consisted of 7,000 SF plaza with decorative paving and 3,100 SF of concrete pavers, concrete walls with a timber boardwalk, 15,000 SF asphalt parking lot with curb and gutter, a restroom building with water and sewer hookups, gabion walls, water connections to pedestrian amenities, electrical improvements including» Read More

New Anchorage Meeting Venue Available- great for Weddings and Reunions!

Anchorage’s NEWEST Training Facility/Conference Center- 6591 A Street, Anchorage, AK 99518 The Davis Campus features “The Megan Room”. Our 1,722 square foot training space/conference center is able to accommodate up to 72 seated classroom style, or 115 seated theater style or up to 115 for a standing reception. Included with your rental are coffee/tea/water service, access to the» Read More

Government Peak Transit Center Chalet

Start Date: 08/30/2013
Completion Date: 12/30/2013
Client: Mat-Su Borough
Location: Hatchers Pass, AK

The Government Peak Transit Center Chalet is a wood frame 4,500 sf  building located in the Hatcher Pass Recreational Area.  The building serves as a shelter for recreation area users and a staging area while waiting for public transit.  

Covenant House Alaska Replacement

Start Date: 07/22/2011
Completion Date: 06/30/2013
Client: Covenant House
Location: Anchorage, AK

Covenant House Alaska is a non-profit youth respite center that offers homeless, runaway, and at-risk youth, ages 13-20, a safe place to stay and get help. This new facility is 42,000 sq. ft. and has counseling areas, music rooms, computer labs, a multipurpose room, 60 rooms for guests, and an area for spiritual needs.

Regal 16 IMAX Cinema Tikahtnu

Start Date: 06/01/2009
Completion Date: 05/01/2010
Client: Browman Development
Location: Anchorage, AK

Regal IMAX Theater at Tikhatnu Commons in Anchorage, AK

Anchorage Airport Terminal Connector

Start Date: 05/01/2008
Completion Date: 12/01/2009
Client: Alaska Department of Transportation / Public Facilities
Location: Anchorage, AK

The Airport Terminal Connector and Mechanical Building will provide an enclosed pedestrian walk-way between the North Terminal and the South Terminal of the Ted Stevens Anchorage International Airport. The combined square footage of the Terminal Connector and the Mechanical Building is approximately 13,000 sq ft.

Fairbanks International Airport Terminal Development

Start Date: 12/01/2005
Completion Date: 09/01/2009
Client: Alaska Department of Transportation & Public Facilities
Location: Fairbanks, AK

This project is using a Construction Manager at Risk (CM@Risk) project delivery system and will consist of three major components: 80,000 sq ft expansion to the south of existing terminal – which will include reconfiguration of roadways, parking, and airside terminal area. 65,000 sq ft renovation of existing terminal built in 1985 – the existing» Read More

Linny Pacillo Parking Garage

Start Date: 11/01/2006
Completion Date: 09/01/2008
Client: Anchorage Center for Convention & Trade
Location: Anchorage, AK

The Linny Pacillo Parking Garage comprises a 9-tier, long-span, post tensioned, thin slab parking structure above retail space. Retail will be at the street level. The footprint on the site is 32,546 sq ft, of which 12,713 sq ft is dedicated to retail space. The total parking capacity is 836 vehicles. The garage employs a» Read More